Symptom
- MTO reference number is taken from the order and not the quote
- When a MTO process is created with a quote, the quote number and not the order number is used as reference in the planned order.
Environment
SAP S/4HANA Cloud Public Edition
Cause
- This behaviour is controlled by the requirement type.
- Currently the Requirement Type is determined using the Material Master Strategy (MRP 3 Tab) first for example value B6 for the material which would result Requirement Type BB6.
Resolution
- In order to have the Sales Order as as the referenced document for the Planned Order this needs to be set/determined to S46.
- For this the SSCUI 105120 "Determine Requirement Type by Item Category and MRP Type" can be adjusted
- The current blank standard content for Src evaluates to 0 which means the Material master strategy is considered first.
- By setting it to 1 - Item Category and MRP Type the underlying table of the SSCUI is taken for the Requirement Type determination and evaluates to S46.
- With this the Planned Order should reference to the Sales Order it was created for.