SAP Knowledge Base Article - Public

3360455 - MTO reference number is taken from the sales quotation instead of sales order

Symptom

When a MTO process is created with a sales quotation, the sales quotation number instead of the sales order number is used as reference in the planned order. 

*Image/data in this KBA is from SAP internal systems, sample data, or demo systems. Any resemblance to real data is purely coincidental.

Environment

SAP S/4HANA Cloud

Cause

This is caused by system configuration. 

Resolution

  • This behaviour is controlled by the requirement type. 
  • Currently the Requirement Type is determined using the Material Master Strategy (MRP 3 Tab) first which is currently B6 for the Demo Material FG228 and will result in Requirement Type BB6.
  • See Quotation Procurement Tab below:
  • In order to have the Sales Order as as the referenced document for the Planned Order this needs to be set/determined to S46. For this the SSCUI 105120 "Determine Requirement Type by Item Category and MRP Type" can be adjusted:
  • The current blank standard content for Src evaluates to 0 which means the Material master strategy is considered first.
  • By setting it to 1 - Item Category and MRP Type the underlying table of the SSCUI is taken for the Requirement Type determination and evaluates to S46.
  • With this the Planned Order should reference to the Sales Order it was created for.

Keywords

MTO, make to order, sales order, planned order, quote, order, s/4HANA Cloud, public cloud , reference, reference number, reference document  , KBA , SD-SLS-SO-MO-2CL , Make-to-order, assembly order (Public Cloud) , Problem

Product

SAP S/4HANA Cloud 2302

Attachments

Pasted image.png
Pasted image.png
Pasted image.png
Pasted image.png