Symptom
You have multiple materials in project where you need to flag the "From Stock" check box every time you add a material.
You want to avoid this and set it as default check.
Environment
SAP Business By Design
Reproducing the Issue
- Go to Project Management work center
- Select view Projects
- Select Project Plan tab
- Navigate to Materials sub tab
- Add row
- Check "From stock" checkbox for each item
- You want to set this as default instead of flagging it every time one by one.
Cause
As of now it is not possible to set "From stock" checkbox as default in standard By Design system.
Resolution
This field is PSM released, so you can check with PDI partner if they can customize it and set this as default.