Symptom
Issue while using CTS+ Transport via charm with Solution Manager to move a PI transport. The following error can be seen from TMS Viewer.
Transport control program tp ended with error code 0200.
Errors: ERROR: see tp's stdout (Standard Out may not be
av
***************************************************
This is tp version 381.23.99 (release 753, unicode enabled)
ERROR: stopping on error 12 during DEPLOYMENT
stopping on error 12 during DEPLOYMENT
tp returncode summary:
TOOLS: Highest return code of single steps was: 12
WARNS: Highest tp internal warning was: 0118
tp finished with return code: 12.
Read more...
Environment
- SAP NetWeaver Process Integration 7.1
- SAP enhancement package 1 for SAP NetWeaver Process Integration 7.1
- SAP NetWeaver 7.3
- SAP enhancement package 1 for SAP NetWeaver 7.3
- SAP NetWeaver 7.4
- SAP NetWeaver 7.5
Keywords
CTS+ Transport, Deployment, Transport, return code 12, Solution Manager, charm process, Change list, locked, Database inconsistencies. , KBA , BC-XI-IBF-VNT , Versioning & Transport , BC-XI-IBC , Integration Builder - Configuration , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.