Symptom
A new Costing Run is created and after selecting a number of materials in the Selection step nothing is returned. There is no result after clicking "Execute" button
Environment
SAP S/4 Hana Cloud
Reproducing the Issue
- Create new Costing Run
- Select materials
- Execute job
- No status for job even though this has finished
Cause
This can be caused if there are configured materials used in the costing run
Resolution
Please check if the materials materials included in the costing run are configured materials.
If so then the option configured materials has to be selected under Selection via Additional Material Master. If this is not set then only non configured materials will be selected.
Configured and non-configured materials cannot be selected in the same costing run. If both are used then two costing runs are needed.
See Also
2023702 - No configured materials selected in T-code CK40N
Keywords
Missing material, empty costing run, configured materials, configurable material , KBA , CO-PC-PCP-2CL , Product Cost Planning (Public Cloud) , Problem