Symptom
It is observed that the system does not read the BoM usage that defined in costing variant -> Quantity structure control.
It reads from the production version as the logic mentioned in KBA 1832841 - CK11N picks incorrect alternative BoM.
De-activating the version indicator in order to let the system read the information of the BoM determination of the quantity structure determination in the costing variant also not works.
Read more...
Environment
S/4 HANA
Product
SAP S/4HANA 1610 ; SAP S/4HANA 1709 ; SAP S/4HANA 1809 ; SAP S/4HANA 1909 ; SAP S/4HANA 2020 ; SAP S/4HANA 2021 ; SAP S/4HANA 2022 ; SAP S/4HANA 2023 ; SAP S/4HANA 2025
Keywords
Bom usage, ck11n, costing variant , KBA , CO-PC-PCP , Product Cost Planning , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.