Symptom
- When you performing the selection step in app "Edit Costing Run" (CK40N) with a material that does not have the 'with quantity structure' indicator active in the material master you receive the message CK172.
- When running app "Create Material Cost Estimate" (CK11N) for the same material you are issued with CK350 and not CK172.
Environment
SAP S/4HANA Cloud
Reproducing the Issue
- Perform the selection step in "Edit Costing Run". Include the material effected.
- In the logs you are issued with the message CK172; "Material & in plant &: No cost est. exists -> raw mat. cost estimate."
- You execute "Material Cost Estimate" on the same material.
- You are issued with the warning CK350; "Mat. & in plant & should be costed in cost est. w/o qty structure".
Cause
Both messages are correct. In "Edit Costing Run", you are attempting to cost or select material & in plant & with costing variant &, but the indicator with quantity structure is not set in the costing view of the material master record (MM02). The system will then create a raw material cost estimate according to the valuation variant. If you have not set 'with quantity structure' then "Edit Costing Run" application will not consider any BoM or special procurement, but always do a raw material costing. This is what message CK172 says.
In "Material Cost Estimates" you can enter a quantity structure manually. This is the reason why message CK350 is raised and then the setting 'with quantity structure' will not be considered.
Resolution
- Go to the material master for the effected material.
- Set the "With Quantity Structure" in costing view 1.
- Cost the material as a raw material cost estimate
See Also
Keywords
Cost Estimate, CK11N, CK40N, Costing Run, CK172, CK350, qty structure, material master , KBA , CO-PC-PCP-2CL , Product Cost Planning (Public Cloud) , CO-PC-PCP , Product Cost Planning , Problem