Symptom
The system throws error while MRP runs for the required product as below
Product in planning area planned with failures; save and check results of interactive planning log
Environment
SAP Business ByDesign
Reproducing the Issue
- Go to the Supply Planning work center.
- Go to the Products view.
- Search required ID with combination area.
- Choose and Open
- Choose Run and execute MRP run
- System throws above error.
Cause
- User is running MRP for required product in combination with planning area where no production model exists for it.
- Since Production Model which exists for the product is with Product Requirement Specification however user is running MRP for product with only planning area without PRS combination exists. Additionally, check Output Product is also not PRS enabled.
Resolution
- Enable required product with PRS specification and update the production model.
- Run MRP again.
Keywords
Product in planning area planned with failures; save and check results of interactive planning log, PRS , MRP run, Product Requirement Specification , KBA , AP-SDM , Supply and Demand Matching , Problem
Product
SAP Business ByDesign all versions