There has a requirement to schedule an program to run from Day1 to Day 15 with a specific variant. The same program needs to be scheduled to run from Day 16 to the last day of the month using a different variant. In other words, The scheduled job needs to be run as per below frequency:
Job1: From 1st to 15th (Every Month)
Job2: From 16th to 31st (Every Month)
Read more...
Environment
SAP S/4HANA
Product
SAP S/4HANA all versions
Keywords
specific date, schedule Job , KBA , BC-SRV-ASF-CAL , Factory Cal., Holiday Cal., PC Calendar , How To