3381226 - How to schedule Job for specific date range of every month

Symptom

There is a requirement to schedule a program to run from Day 1 to Day 15 with a specific variant.
The same program needs to be scheduled to run from Day 16 to the last day of the month, using a different variant.

In other words, the scheduled job needs to be run as per below frequency:
  Job1: From 1st to 15th (Every Month)
  Job2: From 16th to 31st (Every Month)


Read more...

Environment

SAP S/4HANA

Product

SAP S/4HANA all versions

Keywords

specific date, schedule Job , KBA , BC-SRV-ASF-CAL , Factory Cal., Holiday Cal., PC Calendar , How To