3387562 - How to set up CK40N batch job which can run automatically

Symptom

  • Requirement is to set up a CK40N batch job that can run automatically
  • SAP note 3023846 has been followed
  • However during the automatic run of job, message CK075 "Planning date is in the past -> cost estimate cannot be saved" occurred
  • The expected behavior is to set up a batch job with a dynamically changing costing date, without the need to manually change dates every time.


Read more...

Environment

  • S/4 HANA

Product

SAP S/4HANA 2020

Keywords

CK40N, automatical, automatically run, SAPRCK_COSTING_RUN_COPY, SAPRCK_COSTING_RUN_START_STEPS, CK075, planning date is in the past -> cost estimate cannot be saved   , KBA , CO-PC-PCP , Product Cost Planning , Problem