Symptom
- A connection on the coordinator causes versions pile up and user dbspace full and cannot be dropped.
- All the 3 Multiplex (MPX) servers need to be shutdown to clear the versions.
Excerpt of coordinator's IQMSG
Allocation failed. Dbspace IQ_USER_MAIN is OUT OF SPACE
Allocation failed. Dbspace IQ_USER_MAIN is OUT OF SPACE
-- Dbspace IQ_USER_MAIN full (due to versions pile up )
-- then the coordinator is "kill -15" and restarted
IQ OpenDatabase, checkpointblock: 907292204, recover: 1
- The coordinator is shutdown several times.
- In the meantime, the 2 secondary nodes continue loading tables.
- Then, node 2 also hit "out of space" error.
As the coordinator is shutdown several times and this doesn't clear the old versions,
the secondary node 2 needs to be shutdown with kill -9
the secondary node 3 can be shutdown gracefully with stop_iq
Read more...
Environment
SAP IQ 16.1 SP04
Product
Keywords
828579, CR828579, CR#828579 , KBA , BC-SYB-IQ , Sybase IQ , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview