SAP Knowledge Base Article - Preview

3439494 - IBP RTI: Cloud Connector with high availability/Load Balancing setup

Symptom

  • How can one configure the RFC connection on the ECC side for the integration of IBP-RTI within the SM59 transaction, especially when intending to utilize a high availability (Master/Shadow mode) setup for the Cloud Connector.
  • RFC Connection via Cloud Connector with Load Balancing.


Read more...

Environment

  • SAP Integrated Business Planning (SCM-IBP)

Product

SAP Integrated Business Planning all versions

Keywords

IBP, RTI, real-time, integration, high availability, master/shadow , SM59, Cloud Connector, Master, Shadow, mode, load balancing, load, balancing, balance,  , KBA , SCM-IBP-INT-RTI , Real Time Integration , BC-MID-SCC , SAP Cloud Connector On-Demand/On-Premise Connectivity , BC-CST-GW , Gateway/CPIC , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.