3463612 - How 'technically completed' date set for provider contract revenue recognition scenario

Symptom

Unable to figure out how the 'Technically Completed' date (TECO) is determined for provider contract revenue recognition scenario.

Environment

SAP S/4HANA Cloud

Cause

Firstly, the system verifies whether the provider contract item is cancelled or not:

  • If it is cancelled, then the TECO date is set to the end date of the actual period used for the period-end closing.

  • If it is not cancelled, then the system compares the duration date of the provider contract end data and the posting date:
          1) If the end date of the duration period of the contract item is not lower or equal to the end date of the actual period used for the period-end closing then TECO is not set.

          2) If it actually is lower or equal then:
               i. If there is no billing plan then TECO status is set and TECO date is set to end date of the contract duration.
              ii. If there is a billing plan and the billing plan’s maximal/end date is bigger than the end date of the contract then final evaluation against the end date of the actual period used for the period-end closing is made. If the billing plan’s maximal/end date is bigger than the date used for the period-end closing then TECO is not set. Otherwise if it is lower or equal, than TECO is set and TECO date = Billing plan max date.

Resolution

Kindly go though the logic and make sure the TECO status refer to the expected date and revenue be cleared in a expected period.

Keywords

Period end closing, technical completion, TECO, technically completed, revenue recognition, provider contract, completed status, run revenue recognition. , KBA , CO-PC-OBJ-EBR , Event-Based Revenue Recognition , Problem