Symptom
User is generating Freight Unit from Sales Order and creating capacity document on the generated FU's stage with using process controller strategy maintained in the FUBR.
During sales order creation the freight units and capacity document(FO;FB;FWO) is getting generated as expected. But, when user is adding any new material or increasing the quantity of any existing material then a new freight unit generated with a brand new execution document(FO;FB;FWO) for the same sales order.
Example:
Initial situation: SO1 -> FU1 and FU2 -> FB1
After modification on the sales order: SO1 -> FU1 and FU2 -> FB1
-> FU3 -> FB2
Expectation:
Client would like to design their scenario with FUBR and Process controller Strategies that after the modification on the sales order(ERP document) is generated a new FU(based on the FUBR settings), which new FU has to be link to the same capacity document to which other FUs based on the same requirement document are already assigned to
Example:
Initial situation: SO1 -> FU1 and FU2 -> FB1
After modification on the sales order: SO1 -> FU1 and FU2 -> FB1
-> FU3 -> FB1
FUB_COPY_ROUTE set as Process Controller Strategy method"> Read more...
Environment
SAP Transportation Management 120 +
SAP S4/HANA 1709 +
Product
Keywords
FUB_COPY_ROUTE; /SCMTMS/CL_PC_METHODS_FUB=>FUB_COPY_ROUTE; /SCMTMS/CL_PC_METHODS_FUB; execution document; sales order , KBA , TM-PLN-FU-FUB , Freight Unit Building , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.