3472337 - Wrong BOM taken in Cost Estimate

Symptom

After creating Material Cost Estimates (CK11N), you notice that the BOM considered under the Qty Struct tab is not as expected.

Environment

SAP S/4HANA Cloud

Reproducing the Issue

  1. Go to "Create Material Cost Estimates";
  2. Select the Material, Plant and Costing Variant;
  3. Save and check the data under Qty Struct.

Cause

Missing selection while creating Cost Estimate. If you don't enter any data for the quantity structure, the system selects a valid quantity structure for the cost estimate. 

Resolution

In order for the system to consider the expected BOM/Routing, you can make the selection during the creation of the Material Cost Estimate, after fulfilling the Costing Data and Dates.

Note: You cannot enter both a production version and a BOM/routing.

See Also

Costing Variants

Cost Estimate with Quantity Structure

3321471 - Priority sequence for Production Versions in Costing

3357801 - The component materials of material cost estimate are different with the items in BOM

Keywords

BOM usage, costing, production, costing variant, routing, production version, CK11N, cost estimate, quantity structure.  , KBA , CO-PC-PCP-2CL , Product Cost Planning (Public Cloud) , CO-PC-PCP , Product Cost Planning , Problem