Symptom
After safety stock is configured in the material master and the scope of check is set to include it, it is expected that it would also decrease the stock on storage location level.
Read more...
Environment
- Sales And Distribution (SD)
- SAP ERP Available-to-Promise
- SAP R/3
- SAP R/3 Enterprise 4.7
- SAP ERP Central Component
- SAP ERP
- SAP Enhancement Package for SAP ERP
- SAP Enhancement Package for SAP ERP, version for SAP HANA
- SAP S/4 HANA
Product
SAP ERP all versions ; SAP S/4HANA all versions
Keywords
CO09, safety stock, MARC, plant, storage location, MARC-EISBE, V_441V-EISBP, material master, MM02, ATP, scope of check , KBA , SD-BF-AC , Availability Check , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.