Symptom
Using a Planning filter for one specific material and/or one specific location, after the planning job:
- More product or location were planned (or changed) or,
- A second planning job that was running at the same time failed due to location product locked for planning, although the second job has a different planning filter with other location or product.
Read more...
Environment
- SAP Supply Chain Management (SCM)
- SAP Integrated Business Planning (SCM-IBP)
Product
SAP Integrated Business Planning for Supply Chain all versions
Keywords
Planning filter, subnetwork, network, order-based, OBP, location product locked for planning. , KBA , SCM-IBP-RM-PLG , Planning , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.