SAP Knowledge Base Article - Preview

3500158 - "The "Calendar Day" dimension must be drilled to Month or higher level to appear error, using Period over Period calculation

Symptom

The correspondent business scenario requires a SAP Analytics Cloud Story to be built.

The business user is creating a Period over Period Calculation. When trying to Drill down to the Day level of the hierarchy, the following error occurs:
"The "Calendar Day" dimension must be drilled to Month or higher level for "Salary - PM" to appear. Right-click on the "Calendar Day" dimension header and select a different drill level."


Read more...

Environment

  • SAP Analytics Cloud
  • SAP NetWeaver 7.5 SP16 and upwords
  • SAP NetWeaver 7.52
  • SAP NetWeaver 7.53 
  • SAP NetWeaver 7.54 
  • SAP NetWeaver 7.55
  • SAP NetWeaver 7.56 
  • SAP NetWeaver 7.57
  • SAP BW/4HANA 2.0 SP4 and upwords
  • SAP BW/4HANA 3.0

Product

SAP Analytics Cloud 1.0 ; SAP BW/4HANA 2.0 ; SAP BW/4HANA 2021 ; SAP BW/4HANA 2023 ; SAP NetWeaver 7.5 ; SAP S/4HANA 1709 ; SAP S/4HANA 1809 ; SAP S/4HANA 1909 ; SAP S/4HANA 2020 ; SAP S/4HANA 2021 ; SAP S/4HANA 2022 ; SAP S/4HANA 2023

Keywords

"Time dimension", "Current member", "Time Calculation", "Difference From", "Variance" , KBA , BW-BEX-OT-BICS-INA , BW INA provider , LOD-ANA-LDC-BW , SAC Live Data Connection BW , BW4-AE-API-INA , INA (Information Access Protocoll) , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.