SAP Knowledge Base Article - Preview

3500505 - Support package level is not calculated correctly in BIND_PATCH phase.

Symptom

When updating or upgrading an SAP ABAP system with SAP Upgrade Manager (SUM), you may need to include support packages for certain software components not listed in the stack configuration file (Stack XML).

You should have placed the necessary support packages in the download directory or uploaded them to the system, ensuring they are suitable for the upgrade target system.

However, you might find that the expected support package level is not displayed in the BIND_PATCH phase.


Read more...

Environment

NetWeaver ABAP system.

Product

SAP NetWeaver Application Server for ABAP all versions

Keywords

BIND_PATH, SUM, CALCULATED LEVEL, Calculated Level , KBA , BC-UPG-OCS , Online Corr. Support (Tools:Supp.-Pack., Addon Install/Upgr) , BC-UPG-TLS-TLA , Upgrade tools for ABAP , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.