3509310 - MRP creates schedule lines without considering Minimum Lot Size

Symptom

Schedules lines are created with a quantity different from the Minimum Lot Size for a material with a valid schedule agreement, Minimum Lot Size, and Firming MRP Type set in the material master when running MRP.