Symptom
When migrating the products into the system, you have maintained the MRP area data in the migration template. At the simulation step, you get the error message "MRP area does not exist" although the MRP area is valid in the system.
Environment
SAP S/4HANA Public Cloud
Cause
The type of the MRP area you are using is "plant", however, you can only assign a storage location type or subcontracting MRP area to a material.
Resolution
Please use the MRP area with the proper type.
Keywords
Migrate Cockpit, MRP area, type, plant, storage location, subcontracting, master data , KBA , PP-MRP-2CL , Material Requirements Planning (Public Cloud) , Problem