Symptom
After instance refresh, there is a need to set up destination and schedule for all integration center jobs.
- The time entered depends on summer/winter time in the local timezone.
- There is a desire to switch to display and enter UTC time for scheduling.
Read more...
Environment
- SAP SuccessFactors HCM Suite
- Integration Center
Product
SAP SuccessFactors HCM Suite all versions
Keywords
Integration Center, timezone, UTC, GMT, schedule,integration center job, browser,instance refresh. , KBA , LOD-SF-INT-INC-JOB , Integration Center Job , LOD-SF-INT , Integrations , LOD-SF-INT-INC , Integration Center , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview