3528672 - Msg 4050, Level 11, State 3 when install BALDR for SAP ASE for BS

Symptom

  • Refer to Note 2502193 to run the instbaldr script to install BALDR
  • When running the script many procedures failed to be installed due to Msg 4050 
    ...
    Msg 4050, Level 11, State 3:
    Server '<servername>', Procedure 'SP_DBH_ERRORLOG', Line 301:
    Component Integration Services not enabled or not installed.
    Warning: Row size (2083 bytes) could exceed row size limit, which is 1962 bytes.
    Msg 4050, Level 11, State 3:
    Server '<servername>', Procedure 'SP_DBH_TXNLOGUSAGE', Line 470:
    Component Integration Services not enabled or not installed.
    BALDR Script to install data collectors and ATM finished
    BALDR can be activated with stored procedure saptools..SP_BALDR_ACTIVATE
    successful: BALDR is now active


Read more...

Environment

SAP Adaptive Server Enterprise (ASE) 16.0

Product

SAP Adaptive Server Enterprise 16.0

Keywords

BALDR, saptools, monitor, FRUN, installbaldr, instbaldr, failed, sybase , KBA , BC-DB-SYB , Business Suite on Adaptive Server Enterprise , BC-SYB-ASE , Sybase ASE Database Platform (non Business Suite) , Problem