Symptom
- In SAP S/4HANA, when trying to assign a Planning Calendar to a Material that is flagged for Advanced Planning, the system prevents the change from being saved.
- The error message 'Specify a Planning Calendar' (Msg. no. /SAPAPO/MAT172) is displayed repeatedly, preventing the change from being saved.
- This issue occurs during the Change Material process (Transaction MM02).
- The Lot Size Indicator is set to 'K'. The corresponding field is T439A-LOSKZ.
Read more...
Environment
- SAP S/4HANA
- Extended Production Planning and Detailed Scheduling
Product
SAP S/4HANA all versions
Keywords
Specify a Planning Calendar, Material Master, Advanced Planning, Planning Calendar, Lot Sizing Procedure, Period Lot Size, Transaction MM02, /SAPAPO/MAT172, MARC-SCM_TSTRID, T439A-LOSKZ , KBA , SCM-S4H-MD-PR , Product , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview