Symptom
When making confirmation for production order or process order, in goods movement overview, the value of field "Date of Manufacture" and "SLED/BBD" can't be edited at the same time.
Environment
SAP S/4HANA Cloud Public Edition
Reproducing the Issue
- Create production order or process order in Create Production Order app.
- Make confirmation for production order or process order in 'Confirm Production Order Operation' app (CO11n)
- Check and edit the value of "Date of Manufacture" and "SLED/BBD".
Cause
This is a standard system design:
- If the shelf life expiration date check is active:
- If a total shelf life has been defined in the material master record. The value of "Date of Manufacture" can be edited, and the system calculates the "SLED/BBD" from the "Date of Manufacture" plus the total shelf life.
- If no total shelf life has been defined in the material master record:
- If a Min. Rem. Shelf Life has been defined in the material master record. The value of "SLED/BBD" can be edited.
- If no Min. Rem. Shelf Life has been defined in the material master record. The value of "SLED/BBD" and "Date of Manufacture" can't be edited.
- If the shelf life expiration date check isn't active:
- The value of "SLED/BBD" and "Date of Manufacture" can't be edited.
Resolution
To maintain the value of "Date of Manufacture" and "SLED/BBD" at the same time, consider maintaining them in 'Change Batch' app firstly. Then, make confirmation for production order or process order.
See Also
Keywords
API_PROD_ORDER_CONFIRMATION_2_SRV, Time Ticket Confirmation, Batch Characteristics, Material Movements, HTTP201, Batch field properties, Fiori UI, Batch Management, Postman, X-CSRF-TOKEN, Production Order, Manage Batches F2462, Process order, grayed, blank, not possible , KBA , PP-SFC-EXE-CON-2CL , Confirmation (Public Cloud) , Problem