Symptom
Error "MRP failed due to error: Production model for ABC DEF on DD.MM.YYYY HH:MM:SS for quantity * not found" triggered after MRP. (ABC represents product ID; DEF represents planning area ID.)
Environment
SAP Business ByDesign
Reproducing the Issue
- Navigate to work center Supply Planning, access view Products.
- Search for product ABC in supply planning area DEF. Click Open.
- In the "Product Planning Details: ABC/DEF" screen, click "Run Planning - Multi Bom Level", then click OK. An error is triggered: Material ABC in planning area DEF planned with failures; save and check results of interactive planning log.
- Click Save.
- Select the "Interactive Planning Log - Results" tab. The error message is displayed.
Cause
The latest version of the planning model of product ABC in site DEF has a valid to date in the past, causing the error when executing MRP.
Resolution
Change the valid to date of corresponding production model to a date in the future, then release the production model again.
See Also
Keywords
MRP, Production Model, Valid to , KBA , AP-SDM-MSD , Material Supply and Demand View , Problem
Product
SAP Business ByDesign all versions