Symptom
During BOM transfer from the feeder system to the GTS system, the following message is reported in the log.
"BOM for material <(>&<)>1 (<(>&<)>2/<(>&<)>3) <(>&<)>4 will be deleted in GTS system".
For example, "BOM for material ABC (3/1) 1090 will be deleted in GTS system".
Read more...
Environment
- Global Trade Services (GTS)
- Global Trade Services / Logistics Services (SLL)
- SAP Global Trade Services 11.0
- GTS Edition for HANA
Product
GTS all versions ; SAP S/4HANA Foundation 2022 ; SAP S/4HANA foundation 2020 ; SAP S/4HANA foundation 2021 ; SAP S/4HANA foundation 2023
Keywords
BOM for material will be deleted in GTS system, /SAPSLL/PLUG_IN_R3157, , KBA , SLL-LEG-PI-R3 , PI: R/3 , SLL-LEG-RSK , Risk Management , FT-LEG-PRE , Preference Management , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.