Symptom
During BOM transfer from the feeder system to the GTS system, the following message is reported in the log.
"BOM for material <(>&<)>1 (<(>&<)>2/<(>&<)>3) <(>&<)>4 will be deleted in GTS system".
For example, "BOM for material ABC (3/1) 1090 will be deleted in GTS system".
Read more...
Environment
- Global Trade Services (GTS)
- Global Trade Services / Logistics Services (SLL)
- SAP Global Trade Services 11.0
- GTS Edition for HANA
Product
GTS all versions ; SAP S/4HANA Foundation 2022 ; SAP S/4HANA foundation 2020 ; SAP S/4HANA foundation 2021 ; SAP S/4HANA foundation 2023
Keywords
BOM for material will be deleted in GTS system, /SAPSLL/PLUG_IN_R3157, , KBA , SLL-LEG-PI-R3 , PI: R/3 , SLL-LEG-RSK , Risk Management , FT-LEG-PRE , Preference Management , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview