Symptom
- An error "You must first allow price determination for period XXX/ XXXX Message no. C+830" is encountered while running the app 'Edit Actual Costing Runs'.
- This issue arises during the testing of Scope item 33Q, specifically in Step 4.3 "Actual Costing ledger Run".
Environment
SAP S/4HANA Cloud Public Edition
Reproducing the Issue
- Navigate to the 'Edit Actual Costing Runs' app.
- Try to run the Preparation step.
- The error message "You must first allow price determination for period XXX/ XXXX Message no. C+830" appears.
Cause
The issue is caused by the locked authorization (lock symbol) in the system.
Resolution
The Material Ledger Costing Cockpit: Actual Costing, CKMLCP, can be used to allow price determination. To do so, click on the lock symbol of the column Authorization in the Preparation step.
See Also
Keywords
Error C+830, Edit Actual Costing Runs, SAP S/4HANA Cloud Public Edition, price determination, locked authorization, Material Ledger Costing Cockpit, Actual Costing, You must first allow price determination for period XXX / XXXX Message no. C+830 , KBA , CO-PC-ACT-PER , Periodic Material Valuation , Problem
Product
SAP S/4HANA Cloud Public Edition all versions