SAP Knowledge Base Article - Preview

3583451 - How to Ensure Items During Freight Unit Building are Split in Specific Multiples/Increments of Quantities

Symptom

You have an item that is measure in a specific amount of increments. Say 10 M (meters) in a coil, or 100 LB in a Box. If you have a SD/MM document that requires a large enough quantity of this material to require a FU (freight unit) split during FUB (freight unit building) you will notice that the FUBR (freight unit building rule) does not split the FU into even 10 M segments. You may, for example see a FU with 15 M, which is not possible in your business process. Your expectation is that each FU should only contain a multiple of the amount desired.


Read more...

Environment

  • SAP Transportation Management 9.0 - 9.6
  • SAP Transportation Management Embedded in S/4HANA 1709 +

Product

SAP S/4HANA 1709 ; SAP S/4HANA 1809 ; SAP S/4HANA 1909 ; SAP S/4HANA 2020 ; SAP S/4HANA 2021 ; SAP S/4HANA 2022 ; SAP S/4HANA 2023 ; SAP S/4HANA 2025 ; SAP Transportation Management 9.0 ; SAP Transportation Management 9.1 ; SAP Transportation Management 9.2 ; SAP Transportation Management 9.3 ; SAP Transportation Management 9.4 ; SAP Transportation Management 9.5 ; SAP Transportation Management 9.6

Keywords

FU, FUBR, increment, split, multiple, freight unit, freight, building rule , KBA , TM-PLN-FU-FUB , Freight Unit Building , How To

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.