SAP Knowledge Base Article - Preview

3593917 - Host or port is wrong or unavailable during SLD synchronzation

Symptom

During the process of configuring the SLD synchronization between two SLDs A and B the following error is raised: Host or port is wrong or unavailable.

Error during synchronization


Read more...

Environment

  • SAP NetWeaver
  • System Landscape Directory

Product

SAP NetWeaver all versions

Keywords

Host is wrong, Unavailable, Port, sld, Synchronziation , HTTPS, SSL, Host or Port , KBA , BC-CCM-SLD , System Landscape Directory / Component Repository , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.