Symptom
- In BPC, calculating the ownership percentages using the group share method fails after 5 minutes.
- In the network trace, a 500 internal error is returned.
- In TCode ST22, the following dump is generated:
- Category Resource bottleneck
Runtime Errors STACK_STATE_NO_ROLL_MEMORY
-
Short Text
No memory of length 2353575936 available for event stack. -
What happened?
Resource bottleneckProgram "CL_UJP_OWNERSHIP_CAL==========CP" had to be terminated because a capacity limit has been reached.
-
Information on where terminated
The termination occurred in ABAP program or include
"CL_UJP_OWNERSHIP_CAL==========CP", in "CAL_MATRIX_OWN". The main program was "SAPMHTTP".In the source code, the termination point is in line 22 of include
"CL_UJP_OWNERSHIP_CAL==========CM00T".
- Category Resource bottleneck
Read more...
Environment
- SAP Business Planning and Consolidation, version for SAP BW/4HANA
- SAP Business Planning and Consolidation, version for SAP NetWeaver
Product
Keywords
SAP Business Planning and Consolidation, SAP BW/4HANA, Ownership Manager, calculation error, internal server error, group share method, self-own data, POWN value, PCON, PCTRL, PGROUP, METHOD , KBA , EPM-BPC-NW-TDL-OWN , Ownership calculation , EPM-BPC-BW4-CON , BPC/4 - Consolidation, Controls, Journals , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.