SAP Knowledge Base Article - Preview

3626557 - Short dump GETWA_NOT_ASSIGNED while running FCML4H_CCS_CHANGE in SAP S/4HANA

Symptom

  • Short dump occurs with error code "GETWA_NOT_ASSIGNED".
  • The issue arises in the ABAP program "CL_ML4H_PRCCS_SPLITTER========CP" during the execution of the report "FCML4H_CCS_CHANGE".
  • The error message specifies: "Field symbol has not been assigned yet".
  • The termination point is identified in line 13 of the include "CL_ML4H_PRCCS_SPLITTER========CM003".


Read more...

Environment

  • Actual Costing
  • Actual Cost component split

Product

SAP S/4HANA all versions

Keywords

short dump, GETWA_NOT_ASSIGNED, FCML4H_CCS_CHANGE, CL_ML4H_PRCCS_SPLITTER, silent data migration, MLDOC, RLDNR, material ledger, SAP S/4HANA, actual costing, ABAP runtime error, database table, ledger field missing, 2664638, 2907976. , KBA , CO-PC-ACT , Actual Costing , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.