SAP Knowledge Base Article - Preview

3631724 - Assertion failed: BALDR must not be activated before post-load phase in SWPM

Symptom

While trying to do system copy in SID system via SWPM
In the execution phase getting the error: "Assertion failed: BALDR must not be activated before post-load phase"

From sap_devinst.log file:
ERROR  (root/sapinst) id=ind-rel.ind-os.ind-db.assertionFailed errno=CJS-00030
Assertion failed: BALDR must not be activated before post-load phase. ERROR (root/sapinst) id=modlib.jslib.caughtException errno=MUT-03025
Caught ESAPinst Exception in module call: Assertion failed: BALDR must not be activated before post-load phase.. 
TRACE   (root/sapinst) (startInstallation) [SLPGuiEngine.cpp:214] SLPGuiEngine::showMessageBoxHandleButtonImpl()
<html> <head> </head> <body> <p> An error occurred while processing option <i>SAP NetWeaver 7.5 > SAP ASE > System Copy > Target System > Standard System > Based on AS ABAP > Standard System (Last error reported by the step: Assertion failed: BALDR must not be activated before post-load phase)</i>.  


Read more...

Environment

  • SAP Adaptive Server Enterprise 16.0
  • SAP NETWEAVER 7.5

Keywords

BALDR, ASSERTION FAILED, load phase, Saptools  , KBA , BC-DB-SYB , Business Suite on Adaptive Server Enterprise , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.