3632645 - PP/DS order setup time different to S/4HANA Routing setup time

Symptom

The setup time in Production Planning and Detailed Scheduling (PP/DS) does not match with the routing setup time although the setup matrix is not maintained. The setup time is displayed incorrectly in the Detailed Scheduling Planning Board (DSPB) in transaction /SAPAPO/CDPS0.


Read more...

Environment

  • Production Planning and Detailed Scheduling (PP/DS)
  • SAP SCM
  • SAP S/4HANA

Product

SAP S/4HANA all versions

Keywords

setup time, routing, liveCache, utilization rate, duration of activity, SAPAPO/TSTREAM_EFF_CHANGE , KBA , SCM-APO-PPS , Production Planning and Detailed Scheduling , How To