Symptom
The setup time in Production Planning and Detailed Scheduling (PP/DS) does not match with the routing setup time although the setup matrix is not maintained. The setup time is displayed incorrectly in the Detailed Scheduling Planning Board (DSPB) in transaction /SAPAPO/CDPS0.
Read more...
Environment
- Production Planning and Detailed Scheduling (PP/DS)
- SAP SCM
- SAP S/4HANA
Product
SAP S/4HANA all versions
Keywords
setup time, routing, liveCache, utilization rate, duration of activity, SAPAPO/TSTREAM_EFF_CHANGE , KBA , SCM-APO-PPS , Production Planning and Detailed Scheduling , How To