SAP Knowledge Base Article - Preview

3633939 - Planned order in PPDS considers Planned Delivery Time (PDT) instead of In-House Production Time (IHP) from Material

Symptom

  • Planned order is created in PPDS and is incorrectly considering Planned Delivery Time (PDT) value instead of In-House Production Time (IHP) value from Material. 
  • This issue occurs when creating a new planned order using BOM PDS in PPDS. 
  • The system uses PDT for scheduling instead of IHP due to the absence of routing in the Production Data Structure (PDS).

Image/data in this KBA is from SAP internal systems, sample data, or demo systems. Any resemblance to real data is purely coincidental.


Read more...

Environment

  • SAP ERP/ECC connected with SCM APO System
  • SAP Supply Chain Management Integration (SCM-APO-INT)
  • S4HANA embedded PP/DS

Product

SAP S/4HANA all versions

Keywords

PDT, Planned Delivery Time, IHP, In-House Production Time, BOM PDS, Routing, operation. , KBA , SCM-APO-INT-MD-PDS , Production Data Structure , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.