SAP Knowledge Base Article - Preview

3647078 - Duplicate PMR in non-production EWM system

Symptom

  • In Production system (e.g AAA_001), user created a Production Material Request (PMR) by releasing a Manufacturing Order, and (or) used WM Material Staging menu.
  • The PMR was still in process, when a system copy (client copy) was performed.
  • In the target system of the system copy (e.g. a Test system (BBB_001)), the reference Manufacturing Order was changed or WM Material Staging was used.
  • After the Manufacturing Order change, there is a duplicate PMR created in EWM for the same Manufacturing Order in the target system.


Read more...

Environment

  • SAP Extended Warehouse Management
  • SAP S/4HANA

Product

SAP Extended Warehouse Management all versions ; SAP S/4HANA all versions

Keywords

Production Order, Process Order, CO01, CO02, COR1, COR2, COHV , KBA , SCM-EWM-PMR , Production Material Request , SCM-EWM-IF-ERP-PMR , Interface ERP Production Material Request , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.