Symptom
As iFlow package ConcurIntegrationDataExportandFIPosting (SAP Financials Integration with SAP Concur) has an update from version 1.1.24 to 1.1.26, whether if the change log entry for version 1.2.5 covers all the changes included in the update from version 1.1.24 to 1.1.26?
>
Change log of the integration package "SAP Financials integration with SAP Concur" 1.2.5 Updated Iflow Runtime, remove "Target Authorization" from request Header to avoid "Max_Header_Size limlit" issue 1.2.4 Added changeable parameter "timeout" ...
Read more...
Environment
- SAP ERP
- SAP S/4HANA
- SAP S/4HANA Cloud Public Edition
Product
SAP ERP all versions ; SAP S/4HANA Cloud Public Edition all versions ; SAP S/4HANA all versions
Keywords
SAP BTP, iFlow package, version 1.1.26, Max_Header_Size limit, CPI runtime profile, Neo environment, SAP Note 3648199, Concur Integration, timeout parameter, runtime update, Cloud Integration. , KBA , CA-GTF-INT-CON , Concur Integration Content , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview