3686864 - WBS Element field (MEACCT1000-PSP_PNR) column in Account Assignment tab is very long - SAP S/4HANA

Symptom

Before upgrade to S/4HANA, when opening the Account assignment tab in ME53N the column WBS Element field (MEACCT1000-PSP_PNR) was completely visible and did not need to be adjusted, in S/4HANA when the sabe tab is open the field is so long that the contents are not visible and need to be adjusted to be visible without the need to roll the screen.


Read more...

Environment

  • Materials Management (MM)
  • SAP S/4HANA
  • SAP S/4HANA Cloud Private Edition

Product

SAP S/4HANA Cloud Private Edition all versions ; SAP S/4HANA all versions

Keywords

MEACCT1000-PSP_PNR, SAPLMEACCTVI, account assignment, field length, column, me53n, me23n, WBS Element  , KBA , MM-PUR-REQ-GUI , Userinterface - Purchase Requisitions , MM-PUR-PO-GUI , Userinterface - Purchase Orders , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.