Symptom
1. HTTP endpoint of the log collector does not receive data from the log providers.
2. The log collector logs the following message:
for example
Payload too large for project 'transfer_master_data' and stream 'ObjectAuthorizationIn'. Sent by: ':12258'. The sent payload had a size of '57249779' bytes and allowed are less than '20971520' bytes.
A message for 'HTTPS' on port '9093' from '' was larger than the configured maximum size.
Read more...
Environment
SAP Enterprise Threat Detection (On-Premise/Private Cloud)
Product
Keywords
log transfer issue, SAP Enterprise Threat Detection, HTTP POST request size, SAP NetWeaver AS for ABAP, SAP NetWeaver AS for Java, log collector configuration, MaximumRequestSizeInMegabyte parameter, SAP Note 2372375, HTTP endpoint failure, Master Data Transfer. , KBA , BC-SEC-ETD-OPC , SAP ETD (on-Premise/ Private Cloud) , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview