SAP Knowledge Base Article - Preview

3704176 - Gross Volume Calculation Issues in FU Creation with UPB-PB in SAP S/4HANA 2020/2021

Symptom

When creating FUs with UPB-PB, an incorrect Gross Volume is observed at the ROOT level. This issue arises from an erroneous calculation of the layer height, where the packaging material height is added to the total height of packed products.

However, the packaging material has already been marked with a 'Closed' indicator in the 'Sales: General/Plant view' in MM01/MM02. (If a Plant is assigned, the data is at the Plant Level (MARC); if not, it remains at the ROOT Level (MARA)).

The correct calculation should use the packaging material's outer height. This incorrect result can be confirmed via /SCMB/TEST_UPB as well.


Read more...

Environment

SAP Transportation Management embedded in SAP S/4HANA 2020 and 2021

Product

SAP S/4HANA 2020 ; SAP S/4HANA 2021

Keywords

KBA , SCM-BAS-PAK-PB , Package Building , TM-PLN-FU , Freight Unit , SCM-BAS-PAK-UPB , Unified Package Building , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.