Symptom
With release 7.50 a productive usage of a PI "dual stack" is no longer supported. However "Dual Usage type" is supported, ABAP and Java are using different system IDs (SIDs), the Java system is still connected via User Management Engine (UME) to the ABAP system. This means that the Java system cannot start without ABAP. In some case, there might be a business requirement to copy Dual Usage PI 7.5 system. After system copy of both ABAP and JAVA stacks, the new ABAP stack can start, but the new JAVA stack fails to start due to incorrect UME connection.
Read more...
Environment
- SAP NetWeaver 7.5
- SAP Process Integration 7.5 Dual Usage type
Product
Keywords
PI 7.5, dual usage, PI split, Process Integration 7.5, wizard, CTC wizard, system copy, initial setup, PO, AEX, PI-AEX, dual usage type, split, JAVA stack, ABAP stack, JAVA system, ABAP system, UME, user management, UMEBackendConnection, destination , KBA , BC-XI-CON-AFW , J2EE Adapter Framework , BC-JAS-SEC-UME , User Management Engine , BC-XI-CTC , CTC Templates for PI configuration , Problem
About this page
This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).Search for additional results
Visit SAP Support Portal's SAP Notes and KBA Search.
SAP Knowledge Base Article - Preview