SAP Knowledge Base Article - Preview

3710301 - Master Data Load from Datasphere to Sustainability Control Tower Fails with "INVALID_PARNODE_COMBINATION" Error

Symptom

When importing hierarchical master data (e.g., Legal Entity, Business Location) from SAP Datasphere into SAP Sustainability Control Tower (SCT), the import succeeds, but the subsequent validation process fails.

The system displays the following error: INVALID_PARNODE_COMBINATION – Both values for Parent Node Type and Parent Node ID need to be filled out or left empty.

This error is observed on records that are intended to be root nodes (the top level of the hierarchy), where the Parent Node ID and Parent Node Type fields are visually blank in the source data within SAP Datasphere.


Read more...

Environment

  • Sustainability Control Tower
  • Datasphere

Product

SAP Sustainability Control Tower all versions

Keywords

INVALID_PARNODE_COMBINATION, SUS-SCT, SAP Sustainability Control Tower, SCT, SAP Datasphere, DSP, Master Data, Import, Load, Validation Error, Hierarchy, Root Node, Parent Node, NULL, Empty String, Data Builder, CSV Upload, Legal Entity, Business Location. , KBA , SUS-SCT , Sustainability Control Tower , How To

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.