Symptom
- Destination bin is not determined as expected following putaway strategy
- The Goods Receipt is referring to Manufacturing Order/Production order
- WT log shows the destination bin is determined from PSA Production Supply Area (APP ID /SCWM/PSASTAGE) directly without putaway strategy search.
Environment
SAP S/4HANA Public Cloud
Reproducing the Issue
- Go to APP ID CO11n, confirm the manufacturing order.
- GR completed, follow up putaway task created.
- Check the destination bin of the putaway task, it doesn't follow the putaway away strategy. The bin is from APP ID /SCWM/PSASTAGE.
Cause
The system determines the PSA bin directly as the destination bin when there is a control cycle created for material. This behavior occurs because the material is treated as a raw material that needs to be ready for other production orders.
Resolution
If there is inbound delivery involved:
- Delete the control cycle at APP Change Control Cycle for WM (APP ID LPK2) for the by-product material.
- Create a putaway task for the inbound delivery to verify the resolution.
If no inbound delivery is involved:
Set "Automatic WT" as "Inactive" at Customizing "Maintain Storage Types" to disable the putaway task creation. The stock will be GR-ed into Goods Receipt Bin (Maintained at APP Manage Production version, APP ID C223) as ending.
See Also
Keywords
destination bin, inbound delivery, production order, PSA, control cycle, putaway strategy, warehouse task, SAP S/4HANA Cloud, warehouse order processing, WT log, storage type, by-product, Production order, Manufacturing Order , KBA , SCM-EWM-WOP-2CL , Warehouse Order Processing (Public Cloud) , Problem