Symptom
- The runtime limit for processes in SAP Business ByDesign is restricted to a maximum of 10 hours.
- Attempts to increase the runtime limit to 12 hours are unsuccessful due to system-level restrictions.
- Processes running for approximately 9–11 hours are unable to complete due to the runtime limit.
Environment
- SAP Business ByDesign Studio Lifecycle Management.
Reproducing the Issue
- Execute a process in SAP Business ByDesign that requires runtime exceeding 10 hours.
- Observe that the process fails to complete due to the system-level runtime restriction of 10 hours.
Cause
The maximum runtime limit is a system-level restriction inherent to the current SAP Business ByDesign configuration. This limitation cannot be modified to accommodate runtime exceeding 10 hours.
Resolution
- Confirm that the runtime limit is a system-level restriction and cannot be modified to accommodate a 12-hour runtime.
- Optimize the process to reduce runtime and ensure compliance with the 10-hour limit.
- Alternatively, split the workload into smaller batches to allow each execution to complete within the permitted timeframe.
- Refer to relevant resources for guidance on improving performance:
- SAP Cloud Application Studio Performance Best Practices
- SAP Cloud Application Studio Performance Check
- Performance ABSL Trace: New Functionality in 2005 Release
See Also
Refer to: SAP Cloud Application Studio Performance Best Practices
Refer to: SAP Cloud Application Studio Performance Check
Refer to: Performance ABSL Trace: New Functionality in 2005 Release
Keywords
Runtime limit, SAP Business ByDesign, Process optimization, Runtime restriction, System-level limitation, ABSL script, Runtime configuration, Runtime adjustment, Workload management, Script optimization , KBA , AP-RC-BDS-LM , ByDesign Studio Lifecycle Management , Problem
SAP Knowledge Base Article - Public