SAP Knowledge Base Article - Preview

3716934 - Unable to use drill-down functionality when creating custom metrics in Sustainability Control Tower

Symptom

  • After creating a custom metric, when trying to apply "Drill Down By" settings located under "Calculation Settings", the setting is grayed out and is not possible to set. 
  • The issue occurs regardless of the initial configuration of the unit of measure for the metric.


Read more...

Environment

Sustainability Control Tower

Product

SAP Sustainability Control Tower 1.0

Keywords

kpi drill-down issue, water intensity kpi, sustainability control tower, unit of measure, custom metric, common dimensions, drill-down functionality, sap roadmap, feature request, sap influence , KBA , SUS-SCT , Sustainability Control Tower , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.