Symptom
- After upgrading to SAP S/4HANA, a change in BOM selection behavior was observed during product costing using transaction CK40N.
- Previously, the system selected the BOM based on the earliest valid-from date that was less than the costing key date (e.g., BOM A was selected).
- After the upgrade, the system now selects the BOM with the most recent valid-from date prior to the costing date, resulting in BOM X being selected instead.
Read more...
Environment
- Controlling (CO)
- SAP S/4HANA
- SAP enhancement package for SAP ERP, version for SAP HANA.
- SAP S/4 HANA Finance
Product
SAP S/4HANA Finance all versions ; SAP S/4HANA all versions ; SAP enhancement package for SAP ERP all versions
Keywords
CK11N, production version, standard cost estimate, material master, production version selection, quantity structure, validity date , KBA , CO-PC-PCP , Product Cost Planning , Problem