SAP Knowledge Base Article - Preview

3725521 - Error: "SRT: Serialization / Deserialization failed" with Exception "CX_ST_CONSTRAINT_ERROR" while syncing supplier from Ariba to ERP

Symptom

Error: SRT: Serialization / Deserialization failed with Exception CX_ST_CONSTRAINT_ERROR while syncing supplier from Ariba to ERP

Exception Text: Value is longer than the maximum permitted length XX


Read more...

Product

SAP Ariba Supplier Lifecycle and Performance all versions

Keywords

supplier data, erp sync in progress, srt_moni, serialization failed, deserialization failed, cx_st_constraint_error, field length constraint, ariba integration, s4hana, supplier lifecycle, xml integration, payload error, maximum length exceeded, constraint violation, supplier sync issue,Value is longer than the maximum permitted length,SRT: Serialization / Deserialization failed  , KBA , BNS-ARI-SLP-XML , Supplier Lifecycle & Performance - XML Integration , Problem

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.