SAP Knowledge Base Article - Preview

3729425 - Intermittent error "org.osgi.service.blueprint.container.ServiceUnavailableException: The Blueprint container is being or has been destroyed" during message processing

Symptom

  • Message processing intermittently fails with errors similar to: org.osgi.service.blueprint.container.ServiceUnavailableException: The Blueprint container is being or has been destroyed: (objectClass=com.sap.it.rt.scc.connectivity.ConnectivityServiceProvider)
  • The error can appear at different steps within an integration flow.
  • The objectClass in the message may vary depending on which service was accessed at the moment of the failure.


Read more...

Environment

  • SAP Integration Suite
  • SAP Cloud Integration

Product

Cloud Integration 4.0 ; SAP Integration Suite 1.0

Keywords

http receiver, connectivityserviceprovider unavailable, blueprint container destroyed, cell evacuation, tenant restart, exit status 137, serviceunavailableexception, iFlow failure, message processing failure, graceful shutdown interval exceeded, sap integration suite, cloud integration, ServiceUnavailableException; Blueprint container; OSGi; Blueprint destroyed  , KBA , LOD-HCI-PI-OPS , Cloud Operations , LOD-HCI-PI-OP-NM , Node Manager , Known Error

About this page

This is a preview of a SAP Knowledge Base Article. Click more to access the full version on SAP for Me (Login required).

Search for additional results

Visit SAP Support Portal's SAP Notes and KBA Search.