Symptom
Two operations of the same planned order have equal duration and are linked by Start-Start and End-End relationships, but the CTP heuristic does not schedule them in parallel. After running CTP, the two operations' start and end dates/time are different.
Read more...
Environment
- SAP Supply Chain Management
- Production Planning and Detailed Scheduling
Product
Keywords
CTP, ATP, PAC, parallel operations, Start-Start, End-End, operation relationship, lead-time constraint, equal constraint, minimum interval, maximum interval, PDS, finite scheduling, planning board, /SAPAPO/OM024 , KBA , SCM-APO-PPS , Production Planning and Detailed Scheduling , Problem