3735425 - SBC availability check includes safety stock and planned independent requirements for raw materials (planning procedure 3)

Symptom

  • For raw materials with planning procedure 3, safety stock and planned independent requirements (PIRs) are included in the availability check.
  • In the Product View (/SAPAPO/RRP3), entries such as “SStk Req.” (safety stock as requirement) and “FC req.” (planned independent requirements) are considered in net requirements.


Read more...

Environment

  • Product: SAP S/4HANA Cloud Private Edition
  • Supply Creation-Based Confirmation (SBC)

Product

SAP S/4HANA Cloud Private Edition all versions

Keywords

SBC, supply creation-based confirmation, PP/DS, net requirements calculation, safety stock, planned independent requirements, PIR, planning procedure 3, availability check, product view, /SAPAPO/RRP3, aATP, PPAC , KBA , CA-ATP-SBC , ATP: Supply Creation-Based Confirmation , SCM-APO-PPS-SBC , Source Based Confirmation component , Problem